MAUNSELL-AUS/NZ/ASIA/MIDE|AECOM
 
MARKETS & SERVICES
  Transport
  Environment, Water and Civil Infrastructure
Power & Energy
    Hydropower
      Dakr' Tih
      Bakun Hydro
      Nam Theun II
      Kajakai Gates
      Song Ba Ha
      Vaturu Dam
    Thermal & Geothermal
    Renewable Energy
    Transmission & Distribution
    Fuels & Energy
    Energy Advisory Services
  Buildings
  Minerals & Industry
  Specialist Services

Our Quality Management Systems are accredited to international standard ISO 9001:2000.

Internationally accredited Quality Management Systems

 

Vaturu Dam Safety Assessment

Fiji

Project outline

Demand for water from the Nadi-Lautoka region in Fiji has grown significantly over the past decade.  This means that most of time, demand exceeds supply.  As a result, this study was commissioned in order to ensure the continued safe operation of Vaturu Dam. The goal was to maximise its use for the delivery of water, as well as power generation.

Key features

Vaturu Dam is a 55m high-zoned rockfill dam with a crest length of 297m. 

Services to client

Maunsell carried out a comprehensive safety review of Vaturu Dam, including design and construction review, site inspection, assessment of monitoring data, in-service performance review, assessment of dam safety, assessment of current surveillance program, operations and maintenance procedures, and emergency action plan.  The study also included yield analysis and hydrological studies in addition to a reservoir optimisation study.

   
 



Printable PagePrint Window  

 
Home  |  Sitemap  |  Contact Us  |  Privacy  |  Terms of Use  |  Disclaimer